tournesol-kazakhstan-web

Waiting list for Kazakhstan

Our Hosting offer in Kazakhstan is currently full! New mining farm will be available from February 2020. Please fill in the form below and consider that we’ll manage your requests in the order we received its!

0.039 €/kwh

Full waiting list 54 %

Updated on 12/07 at 06:12 pm.

Take place!

Fill in the form

Attractive KWh cost, no rent and 100% green powered.
noun_electricity bill amount_884098
0,039 € TTC
KWh cost (all taxes and fees included)
noun_savings_892646
No rent
Power costs are taken from your production.
noun_Euro_2244498
10% management fees
Levied on net profits
noun_hydro energy_2030264
100% renewable
Source Hydro

Only Asics are accepted

A question ?

Check out our very complete FAQ !

For more information, do not hesitate to consult our very complete FAQ, in particular the “Hosting Feel Mining” section which will hopefully help you to make your decision!

*This amount is given for information purpose and should not be taken for definitive. This calculation is done in comparison with a standard electric tariff of €0.15/kWh in France. The amount of the final rent is subject to a check of the actual electricity consumption of the Client’s machine within Feel Mining premises and only this consumption will be retained for the calculation of actual rent. The latter will be communicated to the Client and their acceptance will be requested before setting up their contract.

Icone Footer Security

100% secure

This website has a valid SSL certificate. Your exchanges are encrypted and secure.

Moyens de paiement Feel Mining logos

Data provided by CoinGecko

Follow us

› Terms of sales › Legal notice

© Feel Mining 2020 - Tous droits réservés